Our Projects
Featured project
Since 2011, at Ciel & Terre we have dedicated our technical expertise and know-how to the research and development of floating photovoltaic solutions adapted to a wide range of ponds applications. Our bold and innovative FPV technologies have been designed for your floating solar projects. Our solutions are both technical and turnkey, as we accompany you through all the stages of your projects. Each project is unique. Entrust it to our teams of experts who will provide you with a personalised response from the design to the installation of the plant and its anchoring.
Find our references for floating solar projects here and get in touch to have our team assess your project for you:
Achieved with Hydrelio®:
Photovoltaic projects installed
Avoided tones of CO2 per year
In our pipeline
Our references
![Kfar Hamaccabi, Israel](https://ciel-et-terre.net/wp-content/uploads/2022/05/Kfar_Maccabi_WEB_Featured_good-324x284.jpg)
Kfar Hamaccabi, ISRAEL
522 kWp
IRRIGATIN POND
Q4, 2019
![Clayton Sand, USA](https://ciel-et-terre.net/wp-content/uploads/2022/05/US-Clayton-Sand_WEB-featured_324-324x284.jpg)
Clayton Sand, USA
3 304 kWp
Sand quarry
Q4, 2021
![Magase Ike, JAPAN](https://ciel-et-terre.net/wp-content/uploads/2023/02/Magase-ike_Featured-VF-324x284.jpg)
Magase Ike, JAPAN
2 662 kWp
Irrigation
Q2 2021
![Taixi, TAIWAN](https://ciel-et-terre.net/wp-content/uploads/2022/05/TW-Taixi_WEB_featured_324-324x284.jpg)
Taixi, TAIWAN
1 023 kWp
Fish pond
Q1, 2022
![Dianbaoxi, TAIWAN](https://ciel-et-terre.net/wp-content/uploads/2022/04/TW-Dianbaoxi-WEB_featured_324-324x284.jpg)
Dianbaoxi, TAIWAN
4 138 kWp
Water storage
Q1, 2021
![Four Water Way, TAIWAN](https://ciel-et-terre.net/wp-content/uploads/2022/05/TW-4th-water-way_WEB_featured_324-324x284.jpg)
Four Water Way, TAIWAN
10 266 kWp
Water storage
Q2, 2021
![Xiqian, TAIWAN](https://ciel-et-terre.net/wp-content/uploads/2022/05/TW-Xiquan-WEB-featured_324-324x284.jpg)
Xiquan, TAIWAN
21 571 kWp
Water storage
Q2, 2021
![Healdsburg, USA](https://ciel-et-terre.net/wp-content/uploads/2022/05/US-Healdsburg_WEB-featured_324-324x284.jpg)
Healdsburg, USA
4 780 kWp
Water treatment
Q1, 2021
![Wanxing, TAIWAN](https://ciel-et-terre.net/wp-content/uploads/2022/05/TW-Wanxing_WEB-featured_324-324x284.jpg)
Wanxing, TAIWAN
22 752 kWp
Water Storage
Q1, 2022
![Altamonte Springs, USA](https://ciel-et-terre.net/wp-content/uploads/2022/04/US-Altamonte_WEB-featured_324-324x284.jpg)
Altamonte Springs, USA
962 kWc
Water treatment
Q4 2020
![Changbing, TAIWAN](https://ciel-et-terre.net/wp-content/uploads/2022/04/TW-Changbing-WEB_featured_324-324x284.jpg)
Changbing, TAIWAN
88 038 kWp
Near shore
Q4, 2020
![Leimersheim, GERMANY](https://ciel-et-terre.net/wp-content/uploads/2022/05/EMEA-Leimersheim_WEB_featured_324-324x284.jpg)
Leimersheim, GERMANY
1 500 kWp
Quarry lake
Q4, 2020
![Logo_UE Union Européenne](https://ciel-et-terre.net/wp-content/uploads/2023/08/Logo_UE.png)
Hydrelio is co-financed by the European Union. Europe is committed to Hauts de France with the European Regional Development Fund.